Page 194 - Advanced Design Examples of Seismic Retrofit of Structures
P. 194
186 Advanced Design Examples of Seismic Retrofit of Structures
FIG. 3.47 Removing the 140cm flooring on the foundation.
FIG. 3.48 Insertion of the connection bars. (Photos taken by T. Honarbakhsh.)
FIG. 3.49 Reinforcement of the new foundation. (Photos taken by T. Honarbakhsh.)
FIG. 3.50 Casting concrete and quality control. (Photos taken by T. Honarbakhsh.)