Example of a Steel Frame Building Retrofitted Chapter  5 359


                   40%
                  Cost of retrofit/cost of reconstruction  30%
                   35%


                   25%
                   20%
                   15%
                   10%
                    5%
                    0%
                          Concentric braces  Eccentric braces  Crossed braces
                 (A)                    Retrofit option

                   88

                   86
                  Construction time, days  84


                   82

                   80

                   78

                   76
                        Concentric braces  Eccentric braces  Crossed braces
                 (B)
                                        Retrofit option
             FIG. 5.32 Comparison of the retrofit options. (A) Construction cost. (B) Construction time.



             Table 5.33. Based on these results, the diaphragm in the floor story of the main
             building is semi-rigid and the diaphragm of the sports building is rigid.


             5.11.3 Torsion

             The procedure is similar to that in Section 5.5.3.


             5.11.4 Soil-Structural Interaction
             The procedure is similar to that in Section 5.5.4.
   394   395   396   397   398   399   400   401   402   403   404