Page 213 - Air and Gas Drilling Manual
P. 213

Chapter 5: Shallow Well Drilling Applications    5-55
                                               82 7 .
                                         =
                                                       = 12 2 . gal/hr
                                      q
                                       f
                                            0 8156 8 33)
                                            (.
                                                 )( .




























                               Figure 5-14:  Drill  string  injection  pressure  (same  as  compressor  output  pressure)  for
                               Illustrative Example 5.3c.

                                   Using the data in Figure 5-14 and similar calculations as those given above the
                               diesel fuel consumption rate as a function of drilling  time  (or drilling  depth) can be
                               obtained.    Figure  5-15  shows  the  diesel  fuel  consumption  rate  as  a  function  of
                               drilling time (or drill depth) for each of these reciprocating piston  compressors.   The
                               approximate total diesel fuel needed (for one compressor unit) to drill the borehole is
                               given  by  the  integration  of  the  area  under  the  curve  in  Figure  5-15.    This  is
                               approximately 281 gallons.  It is standard practice to assume a 20 percent additional
                               volume of fuel for blowing the hole between connections and other operations on the
                               drill  rig.    Therefore,  the  approximate  diesel  fuel  needed  for  a  compressor  unit  is
   208   209   210   211   212   213   214   215   216   217   218