5-56    Air and Gas Drilling Manual
                               approximately 337 gallons.   The total diesel fuel  required  for  the  two  compressor
                               units is, therefore, 674 gallons.
                                   The above Illustrative Examples 5.2a,  b  and c,  and 5.3a,  b,  and c demonstrate
                               the step by step procedures for carrying out engineering calculations needed to  assess
                               the  capabilities  of  air  compressor  systems  used  in  direct  circulation  drilling
                               operations.    The  calculations  also  yield  the  approximate  anticipated  fuel
                               consumption for the compressor systems.  These fuel consumption amounts will  be
                               important information when planning  shallow  drilling  operations  in  remote  areas.
                               Remote area operations are a planning challange to  the  engineer  or  earth  scientist.
                               Drilling operations generally fail because of insufficent planning and lack of operator
                               field experience.



































                               Figure 5-15: Diesel fuel consumption rate as a function of  drilling  time  for reciprocating
                               piston compressor of Illustrative Example 5.3c.