9-32    Air and Gas Drilling Manual
                                                   %
                                                                 75 91
                                                                   .
                                             2 607
                                                   27
                                      ∃ P
                                              .
                                                             .
                                        Tee
                                                                     .
                                      ∃ P Tee  6 391 0 lb/ft 2  2  0 2  & 232 2 2
                                              ,
                                                 .
                               The pressure upstream of the Tee at the top of the annulus, P Tee, is
                                      P     P     ∃ P
                                       Tee   sr     Tee
                                             ,
                                                         .
                                                 .
                                                      ,
                                      P Tee  2 723 3  6 391 0
                                                      2
                                      P Tee  9 114 3 lb/ft abs
                                                .
                                             ,
                                      p Tee  P Tee  144
                                              .
                                      p Tee  63 3 psia
                                 Geometry in the Annulus
                                   Major and minor friction losses must  be  included  in  order  to  obtain  accurate
                               bottomhole  and  injection  pressures.    Therefore,  it  is  necessary  to  include  the
                               geometric dimensions of the drill  pipe tool  joints.   When drilling  at 10,000  ft,  the
                               drill  string is  composed of 9,500  ft of API 4  1/2  inch,  16.60  lb/ft  nominal,  EU-
                               S135,  NC50 (IF) from the surface to  the top  of the drill  collars.    The  4  1/2  inch
                               outside diameter body of the drill  pipe has an inside diameter of 3.826  inches (see
                               Table B-3).  Approximately every 30 ft there are tool joints which are about 1  1/2 ft
                               in length.  The outside diameter of these tool  joints  is  6  5/8 inches with  an inside
                               diameter of 3 1/2 inches.  For the calculations that follow,  the drill  pipe tool  joint
                               lengths  will  be  “lumped”  together  as  a  continuous  length  to  approximate  their
                               contribution to the overall major (wall friction) loss  in  the flow system.    Thus,  the
                               drill pipe tool joints of the drill pipe in the 7,000 ft cased section of the borehole are
                               calculated as a “lump” at the bottom of this cased section.  The drill  pipe tool  joints
                               of the drill pipe in the 2,500  ft openhole section of the borehole are calculated as a
                               “lump” at the bottom of this openhole section.
                                    These lumped approximations for the drill pipe tool joints  are somewhat rough
                               approximations,  but  will  give  quite  accurate  bottomhole  and  injection  pressures.
                               Using this  lumped approximation, the pressure terms along the annulus around the
                               drill pipe and inside the drill pipe are in error by a few percent.  However, this  short-
                               coming can obviously  be relieved  by  calculating  a  short  1  1/2  ft  long  tool  joint
                               every 30 ft along the entire drill  pipe length of the drill  string.   This  can easily be
                               accomplished  with  a  sophisticated  computer  program.    But  these  lumped
                               approximations  are  very  useful  in  demonstrating  the  calculation  technique  steps.
                               These  lumped  approximations  are  very  easy  to  incorporate  in  an  engineering
                               calculation  program  and  it  has  been  found  that  these  approximations  are  quite
                               adequate for most engineering practice applications.