Page 429 - Air and Gas Drilling Manual
P. 429

Chapter 9: Aerated Fluid Drilling    9-33
                                   The calculation sequence for this illustrative example is  divided into  five depth
                               increments.  The increments start at the top  of the borehole with  the first increment
                               at the top and the fifth increment at the bottom.
                                   The total length of the lumped drill pipe body increment (first), H 1, in  the cased
                               section of the borehole is
                                                       7 000
                                                        ,
                                            ,
                                      H 1   7 000  1 5 .
                                                        30
                                      H 1   6 650 ft
                                            ,
                               The  inside  diameter  of  the  casing  along  this  length  of  the  cased  section  of  the
                               borehole is
                                            .
                                      d    8 017 inches
                                       1
                                            d 1
                                      D 1
                                            12
                                            .
                                      D    0 668 ft
                                        1
                               and the outside diameter of the drill pipe body along this length is
                                      d  2  450 inches
                                            .
                                            d 2
                                      D
                                        2
                                            12
                                      D 2   0 375 ft
                                             .
                                   The total length of the lumped drill pipe tool  joints  increment (second),  H 2, in
                               the cased section of the borehole is

                                                7 000
                                                ,
                                      H 2   15 .
                                                 30
                                      H     350 ft
                                        2
                               The  inside  diameter  of  the  casing  along  this  length  of  the  cased  section  of  the
                               borehole is
                                      D 1  0 668 ft
                                            .
                               and the outside diameter of the drill pipe tool joints along this length is
   424   425   426   427   428   429   430   431   432   433   434