Chapter 9: Aerated Fluid Drilling    9-69
                               injection pressure.  And while drilling at 7,000 ft of depth, the lowest air volumetric
                               flow rate and highest injection pressure will be required.
                                   The anticipated  drilling  rate  of  penetration  is  estimated  to  be  60  ft/hr.    The
                               vertical interval section to be drilled is from a depth of 7,000 ft to a depth of 10,000
                               ft, or a 3,000 ft length of borehole.  Therefore, the estimated actual drilling  time  to
                               drill  this  interval is  approximately 50 hours.    Using  similar  calculations  as  those
                               given above, the injection pressures as a function of drilling depth and, thus, drilling
                               time  can  be  obtained.    Figure  9-6  shows  the  injection  pressure  as  a  function  of
                               drilling  time  for  the  interval  from  7,000  ft  to  10,000  ft.    Figure  9-7  shows  the
                               injection air volumetric flow rate as a function of drilling  time for the interval from
                               7,000 ft to 10,000 ft.






































                               Figure  9-5:  Pressure  profile  in  the  inside  of  the  drill  string  and  in  the  annulus  for
                               Illustrative Example 9.3 (q g = 1,168 acfm and a drilling depth of 10,000 ft).
   460   461   462   463   464   465   466   467   468   469   470