                                   Illustrative Examples 10-2 and 10-3 demonstrate the calculation procedures (step
                               Nos.  1 to  10 given in  Section 10.1) that can be used to  plan a typical deep oil  or
                               natural gas well drilling operation.




































                               Figure  10-8: Fuel consumption rate as a function of drilling  time  for compressor  used  in
                               Illustrative Example 10.2 (q g = 1,500 acfm from the compressor).
                               10.6  Field  Comparison
                                   The  following  case  history  of  vertical  drilling  operation  demonstrates  the
                               accuracy of the planning calculation procedures discussed earlier that utilize complete
                               major and minor friction loss terms.
                                 Case History This was a vertical well drilled to  a depth of 9,571  ft in  an oil  and
                               natural  gas  producing  basin  in  North  Africa  (Cambrian  formation  target).    The
                               borehole profile is described by an 9  5/8 inch intermedicate casing run from surface
                               to 7,632 ft.  Below  the intermediate casing is  a 7 inch production liner that is  tied