Page 95 -
P. 95

GENERAL LINEAR PROGRAMMING NOTATION  75


                                      each, and labelling and filling costs are estimated to be E0.03 for each jar of salsa
                                      produced. Miguel’s contract with Western Foods results in sales revenue of E1.64 for
                                      each jar of Western Foods Salsa and E1.93 for each jar of Mexico City Salsa.
                                      a. Develop a linear programming model that will enable Miguel’s to determine the mix of
                                        salsa products that will maximize the total profit contribution.
                                      b. Find the optimal solution.
                                  16 As part of a quality improvement initiative, government employees complete a three-day
                                      training programme on teamwork and a two-day training programme on problem solving.
                                      The manager of quality improvement requested that at least eight training programmes on
                                      teamwork and at least ten training programmes on problem solving be offered during the
                                      next six months. In addition, senior-level management specified that at least 25 training
                                      programmes must be offered during this period. A consultant is used to teach the training
                                      programmes. During the next six months, the consultant has 84 days of training time
                                      available. Each training programme on teamwork costs E10 000 and each training
                                      programme on problem solving costs E8000.
                                      a. Formulate a linear programming model that can be used to determine the number of
                                        training programmes on teaming and the number of training programmes on problem
                                        solving that should be offered in order to minimize total cost.
                                      b. Graph the feasible region.
                                      c. Determine the coordinates of each extreme point.
                                      d. Solve for the minimum-cost solution.

                                  17 Does the following linear programme involve infeasibility, unbounded and/or alternative
                                      optimal solutions? Explain.
                                                                Max  4x 1 þ 8x 2
                                                                s:t:
                                                                     2x 1 þ 2x 2   10
                                                                     1x 1 þ 1x 2   8
                                                                      x 1 ; x 2   0

                                  18 Does the following linear programme involve infeasibility, unbounded and/or alternative
                                      optimal solution? Explain.
                                                               Max  1x 1 þ 1x 2
                                                               s:t:
                                                                    8x 1 þ 6x 2   24
                                                                    4x 1 þ 6x 2   12
                                                                         2x 2   4
                                                                     x 1 ; x 2   0

                                  19 Management of High Tech Services (HTS) would like to develop a model that will help
                                      allocate their technicians’ time between service calls to regular contract customers and
                                      new customers. A maximum of 80 hours of technician time is available over the two-
                                      week planning period. To satisfy cash flow requirements, at least E800 in revenue (per
                                      technician) must be generated during the two-week period. Technician time for regular
                                      customers generates E25 per hour. However, technician time for new customers only
                                      generates an average of E8 per hour because in many cases a new customer contact
                                      does not provide billable services. To ensure that new customer contacts are being
                                      maintained, the technician time spent on new customer contacts must be at least
                                      60 per cent of the time spent on regular customer contacts. Given these revenue and
                                      policy requirements, HTS would like to determine how to allocate technician time




                Copyright 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s). Editorial review has
                      deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
   90   91   92   93   94   95   96   97   98   99   100