Page 103 -
P. 103

Mud Pumps                                                      79


        REFERENCES
        Guo, B., Lyons, W.C., Ghalambor, A., 2007. Petroleum Production Engineering, A
           Computer-Assisted Approach. Elsevier.
        Moore, P.L., 1986. Drilling Practices Manual, second ed. PennWell Books.

        PROBLEMS

        3.1 Solve the problem in Illustrative Example 3.1 with a cuttings concen-
            tration value of 10% in all hole sections.
        3.2 Solve the problem in Illustrative Example 3.2 with a mud flow rate
            of 300 gpm.
        3.3 Solve the problem in Illustrative Example 3.3 with a mud flow rate
            of 300 gpm.
        3.4 Solve the problem in Illustrative Example 3.4 with a liner size of 4 in.
   98   99   100   101   102   103   104   105   106   107   108