Page 103 -
P. 103
Mud Pumps 79
REFERENCES
Guo, B., Lyons, W.C., Ghalambor, A., 2007. Petroleum Production Engineering, A
Computer-Assisted Approach. Elsevier.
Moore, P.L., 1986. Drilling Practices Manual, second ed. PennWell Books.
PROBLEMS
3.1 Solve the problem in Illustrative Example 3.1 with a cuttings concen-
tration value of 10% in all hole sections.
3.2 Solve the problem in Illustrative Example 3.2 with a mud flow rate
of 300 gpm.
3.3 Solve the problem in Illustrative Example 3.3 with a mud flow rate
of 300 gpm.
3.4 Solve the problem in Illustrative Example 3.4 with a liner size of 4 in.