Page 62 - APPLIED PROCESS DESIGN FOR CHEMICAL AND PETROCHEMICAL PLANTS, Volume 1, 3rd Edition
P. 62

Process Planning, Scheduling and Flowsheet Design                      49

                                         nt  Block  Limit  Li
                                         New  Steam  Line
                                         to  Storaoe Tanks


                                         New 50% Caustic







                                                                            Figure 1-41. Account diagram for accumulation of
                      Account  No.6014                      e(y  Loading
                                                           and  Line,       project costs. Cost estimates must be made to con-
                                                           Account  No. 8532   form to same scope basis.

          the process engineer present  proper breakdown details,   18. Warren, C. W., “How to Read Instrument Flow Sheets, Part I
          and these then serve to coordinate the cost breakdowns.   and 11,” HydrocarbonProcessing54, No. 7, 1975, p. 163 and No.
          Figure 1-41 is an example of such an accounting diagram.   9, 1975, p. 191.
                                                                19. Ludwig, E. E., Applied ProjectEngineering and Management, 2nd
                                                                  Ed., Gulf Publishing Co., Houston, Texas, 1988.
                               eferences                        20. Glassburn, L. E., “Industrial Noise: Properties,  Sources and
                                                                  Solutions,” Hydrocarbon Processing, V. 60, No. 8, 1981, p. 127.
           1. Attawzy, D.,  “Mechanical Engineering Plant Layout Princi-   21. Burklin,  C.  R.,  “Safety Standards Codes  and  Practices  for
             ples and Fundamentals,” The Pet. Enp, Jan.  1956, p. C-16.   Plant Design,” Chem. Eng., V79, No. 25, 1972, p. 143.
           2. Berg, R. H., “Handy Way to Scale Drawings For Flowsheets,”   22. Arcuri, K., “Quiet-Streamline Design to Comply with OSHA
             Chem. Eng., May 19; 1958, p. 174.                    Rules,” Chem. Eng., V. 80, No. 1, 1973, p. 134.
           3. Bjelland, A. A.,  “Do Design Models Save Money?” Re$ En@,   23. Kinsley, G. R. Jr., “Specifymg Sound Levels for New  Equip-
             Oct. 1959, p. c-15.                                  ment,” Chem. Eng., June 18, 1979, p. 106.
           4. Chilton, C. H., “Six Tenths Facto?;” Applies to Complete Plant   24. Stein,  T.  N.  “Analyzing and  Controlling  Noise  in  Process
             Costs, Ghem. Eng., reprinted in Cost Engineerlng in the Process   Plants,” Chem. Eng., V. 87, No. 5, 1980, p. 129.
             Industries Estimation, McGraw-Hill Book GO., 1960.   25. Ludwig,  E.  E.,  “Project  Managers  Should  Know  OSHA,”
           5. Keating,J. W. and R. D. Geckler, “Propellant Manufacturing   Hydrocarbon Processing, V. 52, No. 6, 1973, p. 135.
             Methods  For  Large  Solid  Rockets,” presented  at  Atlanta   26. “Risk Management,” Chem. Eng. Prog., V. 86, No. 3, 1990 p. 21.
             meeting AIChE, Feb. 1960.                          27. Freeman,  R.  A.,  ‘‘What  Should  YOU Worry  About  When
           6. Larson, G. A., “Annual Savings, Return and Depreciation Fix   Doing a Risk Assessment,” Chem. Eng. Prog., ’t: 85, No.  11,
            Justifiable Investment,”  Powq Sept. 1955, p. 103.     1989, p. 29.
           7. Ludwig, E. E.,  “Petrochemical Process Engineering,” ReJin-   28. Crume, R. V.,  “How to  Streamline Air  Toxic$ Risk  Assess-
             ingEng?r, Mar. 1960, p. C-8.                         ments,’’  Pollution Eng., V. 22, No. ’7,  1990, p. 92.
           8. Mears, R. B., “Plant Site Layout Minimize Corrosion,” Chem.   29. Cheremisinoff, P.  N.,  “Regs Add  Complexity to  Hazardous
                                                                  Waste Facility Siting,”  Pollution Eng., V.  22, No. 7, 1990, p. 77.
             Eng.,Jan. 11, 1960, p. 144.
           9. Q’Donnell, J. P.,  “How F1owsheets Communicate Engineer-   30. Cheremisinoff,  P. N.,  “Power Plants  Face  Stricter  Controls
                                                                  for Clean Air,” Pollution Eng., V. 22, No. 6, 1990, p. 66.
             ing Information,” Chem. Eng., Sept. 1957.
          10. Page, 9. S., Estimator’s Manual  of  Equipment and  Installation   31. Majumdar, S. B.,  “Regulating Requirements and Hazardous
                                                                  Materials,” Chem. Eng. Prog., V.  86, No. 5, 1990, p. 17.
             Costs, Gulf Publishing Co., Houston, Texas, 1963.   32. Hall, R. S., W. M. Vaiaruk, andJ. Matley, “Estimating Process
          11. Page, J. S., Estimators’ General Construction Man-Hour Manual,   Equipment Costs,” Chem. Eng., V.  95, No. 17, 1988, p. 66.
             2nd ed.; Gulf Publishing Go., Houston, Texas, 1977.   33. Remer,  D.  S.  and L. H. Chai, “Estimate Costs of Scaled-up
          12. Page, J. S., Estimator’s Man-Hour Manual on Heating, Air Con-   Process Plants,” Chem. Eng., V. 97, No. 4, 1990, p. 138.
             ditioning,  Ventilating and Plumbing, 2nd ed., Gulf Pitblishing   34. Hall, R. S., J. Matley, and K J. McNaughton, “Current Costs
             Go., Houston, Texas, 1977.                           of Process Equipment,” Chenz. Eng.,  \J.  89, No. 7, 1982, p. 80.
          13. Page,J. S. and Nation,J. G., Estimator’s PipingMan-HourMan-   35. Matley, J., “6. E. Plant Cost Index-Revised,”  Chem. Eng., V.
             ual, 2nd ed., Gulf Publishing Co., Houston, Texas, 1976.   89, No. 8, 1982, p. 153.
          14. Page, J. S. and Nation: J. G., Estim,atorS Electrical Man-Hour   36. Strauss, R., “Use and Misuse of Manufacturing Cost Systems,”
             Manual, Gulf Publishing Co., Houston, Texas, 1939.    Chem. Eng., V.  94, No. 8, 1987, p. 87.
          15. Paton, Bruce L., “Do Models Pay Out?” ReJ: Engx, 35, No. 11,   37. Matley, J.  and  A.  Hick,  “Cost  Indexes  End  1987  on  an
             1956, p. 161.                                        Upswing,” Chem. Eng., V.  95, KO. 5, 1988, p. 71.
          16. Thompson, D.,  “’Rational Approach  to Plant Layout,” Chem.   38. Poland, G. F., “Estimating Gash Flows for Construction Pro-
             Eng. Dec. 28, 1959, p. 73.                           jects,” Chem. Eng., V. 89, N. 16, 1982, p. 81.
          17. WaPas, S. M. and C. D. Spangler, “Process Equipment Nomo-   39. Correia, E. V., “Cost Control Begins with Budgeting,” Chem.
             graph,” Chem. Eng., 67, Mar. 21, 1960, p. 173.       Eng., V.  87, No. 6, 1980, g. 87.
   57   58   59   60   61   62   63   64   65   66   67