10                       Applied Process Design for Chemical and Petrochemical Plants


























































            percent  range.  Even  these  costs  can  be  reduced  if  all   Flowsheet Presentation
            minute detail is avoided, and only basic decision making
            piping  is included.  The necessary model  structure and   Experienced flowsheet layout personnel all emphasize
            rough  block  outline  equipment for a $1 million hydro-   the  importance  of  breaking  processes into  systems and
            carbon  compression  and processing plant  costs around   logical parts of systems such as reaction, compression, sep-
            $1,000 to $2,000.                                     arating, finishing, refrigeration, storage, etc., for detailed
                                                                  drafting. This point cannot be overemphasized, since con-
                                                                  siderably more space is needed for final completion of all
              Paton  [15] reports total model costs of 0.4 to 1.0 per-   details than is usually visualized at first. The initial layout
            cent of erected plant  costs for a $1 million plant. These   of the key equipment should be spread farther than looks
            are actual costs and do not reflect profits. Material costs   good to the eye. In fact, it probably looks wasteful of draw-
            are less than 10 percent of total model costs, and usually   ing space.
            less than 5 percent. For a $30 million plant model costs   Later  as  process  and  sometimes service lines, valves,
            run as low as 0.1  percent.  These  are for models which   controls  and miscellaneous small accessories are  added
            include plant layout, piping layout, and piping details. If   this  “extra” space will  be  needed  to  maintain  an  easily
            simpler models are used the costs should be less.     readable  sheet.  As  this  develops,  attention  should  be