Page 105 - Beyond Decommissioning
P. 105

86                                                 Beyond Decommissioning

         Disclaimer


         Websites accessed on 29 December 2018.

         References

          ˚
         Akerman, E., 2016. Development of Circular Economy Core Indicators for Natural Resources.
             Master of Science Thesis, Stockholm, http://www.diva-portal.org/smash/get/diva2:
             897309/FULLTEXT01.pdf (Accessed on 29 December 2018).
         Bullen, P., Love, P., 2011. Factors influencing the adaptive re-use of buildings. J. Eng. Des.
             Technol. https://www.researchgate.net/publication/235307181_Factors_influencing_the_
             adaptive_re-use_of_buildings (Accessed on 29 December 2018).
         Canadian Standards Association, 2006. Guideline for Design for Disassembly and Adaptability
             in Buildings. Z782-06, Mississauga.
         Centre of Land Policy and Valuations, Polytechnic University of Catalonia, 2014. Urban
             recycling of derelict industrial sites. Analysis of socio-economic redevelopment of
             post-industrial districts, Barcelona. 24 January 2014, https://upcommons.upc.edu/
             bitstream/handle/2099.1/21140/IvanNikolic.pdf (Accessed on 29 December 2018).
         Collum, B., 2016. Chapter 16: “Future-proofing”. In: Nuclear Facilities—A Designer’s Guide.
             Woodhead Publishing Series in Energy No. 112, ISBN 978-0-08-101938-2.
         Farrow, E.C., 2008. A New Life: Adaptive Reuse and Redevelopment of Decommissioned
             Commercial Nuclear Power Plants. A Thesis, University of Florida, http://etd.fcla.edu/
             UF/UFE0023705/farrow_e.pdf (Accessed on 29 December 2018).
         Gillin, K., 2018. Rethinking decommissioning through a sustainability lens. Nucl. Eng. Int.
             https://secure.viewer.zmags.com/publication/ed63ea7c#/ed63ea7c/1 (Accessed on 29
             December 2018).
         International Atomic Energy Agency, 2002. Safe and Effective Nuclear Power Plant Life Cycle
             Management Towards Decommissioning. IAEA-TECDOC-1305, IAEA, Vienna.
         International Atomic Energy Agency, 2006. Release of Sites From Regulatory Control on
             Termination of Practices. Safety Standards Series No. WS-G-5.1, IAEA, Vienna.
         International Atomic Energy Agency, 2008. Nuclear Energy Basic Principles. NE-BP, IAEA,
             Vienna.
         International Atomic Energy Agency, 2011. Design Lessons Drawn From the Decom-
             missioning of Nuclear Facilities. IAEA-TECDOC-1657, IAEA, Vienna.
         International Atomic Energy Agency, 2012a. Monitoring for Compliance With Exemption and
             Clearance Levels. Safety Reports Series No. 67, IAEA, Vienna.
         International Atomic Energy Agency, 2012b. Monitoring for Compliance With Remediation
             Criteria for Sites. Safety Reports Series No. 72, IAEA, Vienna.
         International Atomic Energy Agency, 2014a. Decommissioning of Facilities, General Safety
             Requirements. Safety Standards Series No. GSR Part 6, IAEA, Vienna.
         International Atomic Energy Agency, 2014b. Radiation Protection and Safety of Radiation
             Sources: International Basic Safety Standards, General Safety Requirements. Safety Stan-
             dards Series No. GSR Part 3, IAEA, Vienna.
         Makansi, 2012. Comprehensive Asset Management for Nuclear Plants, 02/01/2012, https://www.
             powermag.com/comprehensive-asset-management-for-nuclear-plant/ (Accessed on 29
             December 2018).
         Munce, J.F., 1964. The Architect in the Nuclear Age. The Design of Buildings to House Radio-
             activity. Iliffe Books Ltd, London.
   100   101   102   103   104   105   106   107   108   109   110