38                           Biomass Gasification, Pyrolysis and Torrefaction


            2.3.4 Torrefier Cost
            Similar to the gasifier, the capital cost of a torrefaction plant also depends on
            the technology selected. Torrefier technologies fall under two broad categories:
            1. Directly heated
            2. Indirectly heated.

               The cost of indirectly heated units could be a little higher than the cost of
            directly heated units. Uslu et al. (2008) quoted a cost in the range 4.5 11.5
            million euro for a 25 MWth torrefaction plant. Peng et al. (2011) gave a
            comparison of capital cost of a 126,000 ton/year torrefaction unit for three
            technologies as listed below:
            1. Moving bed torrefier: m$10.73
            2. Rotary drum: m$17.58
            3. Screw torrefier: m$25.45
               Commercial use of torrefaction is relatively new. So, only limited data is
            available on its capital cost. These values are theoretical or biased on higher
            side by the development cost. Based on capital cost (capital cost per unit
            capacity) collected from some published and unpublished sources, specific
            torrefier cost is plotted against capacity in Figure 2.2. In spite of large varia-
            tion, one could detect an economy of scale from the figure.
               It may be noted that a torrefier reactor is just one component of the total
            torrefaction plant that needs additional units like dryer, cooler, mills, storage,
            biomass handling, building, and others. Such units are relatively independent
            of the torrefier, and could add another 50 100% to the total plant cost
            (TPC) depending upon the cost of the torrefier.


                   30
                  Specific capital cost, m$. TPH  20
                   25



                   15

                   10



                    0 5
                     0      5      10     15     20     25     30     35
                                      Capacity, tons/h (TPH)
            FIGURE 2.2 Capital cost (per unit ton per hour capacity) of torrefier against capacity of unit.
            The scatter is due to different sources with varying conditions and technologies.