Boiler Plant Calculations                                                                        203



                ANALYzING COSTS AND BENEFITS OF AN                  Part II: Economic analysis, Payback Period
                ECONOMIzER AND AN OxYGEN
                TRIM SYSTEM                                                                     FC
                                                                    Payback Period  PP =  ————
                                                                                              S – C
                Part 1: Economic Analysis, Estimating Percent
                Savings and Dollar Savings                               PP  =  Payback period
                                                                         PC  =  First cost
                As found conditions:                                     S =  Annual fuel savings
                     Fuel                    Natural Gas                 C =  Annual maintenance costs
                     Annual Fuel Bill          $100,000
                     Oxygen O  2                  11.0%             Option 1. Calculate payback period for the oxy-
                     Net stack temperature         600F  [316C]     gen trim system if the maintenance cost is $1,000/
                     Efficiency                   70.3%             yr.


                Option 1. Install an Oxygen Trim system with an                     10,000
                                                                         PP =    ——————          =  ————YR.
                installed cost of $10,000 to reduce excess air to                11,700-1,000
                2.0%.
                                                                    (Ans.: .93 YR.)
                New oxygen O  level                2%
                               2
                Net stack temperature             600F  [316C]
                New efficiency                  79.6%               Option 2. Calculate payback period for an econo-
                                                                    mizer if the maintenance cost is $1,000/yr.
                1.   Efficiency Improvement       ______%
                     (Ans.: 9.3%)                                                   30,000
                                                                         PP =    ——————          =  ————YR.
                                                                                 16,000-1,000
                2.   Percent Fuel Savings         ______%
                     (Ans.: 11.7%)
                                                                         (Ans.: 2.0 YR.)

                3.   Fuel Savings Dollars        $______/YR
                     (Ans.: $11,683/YR)
                                                                    Part III:  Economic Analysis,
                                                                    Return on Investment
                Option 2.  Install  economizer  with  an  installed
                cost of $30,000 to reduce stack temperature to
                                                                    Return on investment
                200F.
                                                                                      S-DC
                     Oxygen O  level             11.0%                   ROI (%) =  ———  x 100
                               2
                     Net stack temperature        200F  [93C]                          PC
                     New efficiency             83.7%
                                                                         ROI =  Return on Investment
                4.   Efficiency Improvement  ______%                     S =  Annual fuel savings $/Yr
                     (Ans.: 13.4%)                                       DC  =  Depreciation charge
                                                                             First cost/Estimated Lifetime
                5.   Percent Fuel Savings     ______%                    PC  =  First Cost
                     (Ans.: 16%)
                                                                    Option 1. Calculate the ROI for the oxygen trim
                6.   Fuel Savings Dollars     $______/YR            system if the estimated lifetime is 15 years:
                     (Ans.: $16,000/YR)