Page 62 - Bridge and Highway Structure Rehabilitation and Repair
P. 62
CHAPTER 1 OVERVIEW OF BRIDGE ENGINEERING 37
• EA (environmental assessment): An EA is required when the significance of the environ-
mental impact is not clearly established.
• EIS (environmental impact statement): EIS documents need to be prepared when a replace-
ment or new bridge (usually with four or more lanes) has signifi cant impact on natural,
ecological, or cultural resources including on endangered species, wetlands, fl ood plains,
groundwater, fauna, and flora. An EIS is required when there are impacts on properties
protected by the DOT Act or the Historic Preservation Act. Significant impacts on noise
and air quality need to be avoided.
• CE (categorical exclusions): An action that does not have a significant effect on the environ-
ment falls under CE. Examples provided by FHWA are reconstruction or modifi cation of
two-lane bridges, adding pedestrian or bicycle lanes, widening for shoulders, installation
of signs, etc.
BIBLIOGRAPHY
Accelerated Bridge Construction
Bashir, Tariq M. Nysdot Lozano and Genaro Lozano, Roll-In Roll-Out Reduces Construction Impact to
Local Traffic, HNTB Corporation.
High Performance Steel Bridge Concepts, American Iron and Steel Institute, J. Muller International,
November 1996.
Khan, Mohiuddin Ali and Richard W. Dunne, “Recent Developments in ABC Technology,” Paper Presented
to FHWA Conference on Accelerated Bridge Construction, Baltimore, MD, 2008.
Lushko, Brian, “Accelerated Bridge Construction,” Structure Magazine, August 2007.
Precast Slab System Workshop Summary Report, Minnesota Department of Transportation and Federal
Highway Administration, September 2005.
Prefabricated Bridges, American Association of State Highway and Transportation Offi cials Technology
Implementation Group, May 2002.
Ralls, Mary Lou, Ronald Medlock and Sharon Slagle, “Prefabricated Bridge National Implementation
Initiative,” NCBC Concrete Bridge Conference, Nashville, TN, October 2002.
Aesthetic Bridges
Aesthetic Bridges User’s Guide, Maryland State Highway Administration, January 2005.
Barratt, Stephen D., “New York’s First Transparent Noise Barrier,” Bridges Magazine, July/August,
2006.
Long Span Structures
Khan, Mohiuddin Ali, “An Experimental Study of Flat Cable Nets,” First Kerensky International Confer-
ence on Tension Structures, Institute of Structural Engineers, American Society of Civil Engineers,
American Society of Civil Engineers and International Association of Bridge and Structural Engi-
neering, London, 1988.
Khan, Mohiuddin Ali, “Factors Affecting Structural Behavior of Suspension Cables Nets,” International
Conference Proceedings, American Society of Civil Engineers/Structural Engineering Institute, New
York, NY, 2005.
Khan, Mohiuddin Ali, “Structural Applications of Suspension Cables and Cable Nets,” International
Conference Proceedings, American Society of Civil Engineers/Structural Engineering Institute,
Seattle, WA, 2003.
Khan, Mohiuddin Ali and H. Tottenham, “Elastic Non-linear Analysis of Prestressed Cable Networks Using
Equivalent Continuum Theory,” IASS Pacifi c Symposium Proceedings, Tokyo, October 1993.
Khan, Mohiuddin Ali and H. Tottenham, “Static Behavior of Prestressed Cable Cooling Towers,” Second
International Conference on Civil Engineering Proceedings, Pahlavi University, Shiraz, Iran, 1976.