Chapter 11 I Tool Holders and Testing


          Place one of the strain-relief clamps through the top openi ng of
          the junction box and one in the bottom opening. Insert them from
          the inside of the box with the adjusting screws facing out (see
          Figure I1.6l.

                                                                           Figure 11.6
                                                                           Installingthe strain-
                                                                           relief clamps.























          You now need a coup le of weak springs to provide tension for the
          slide. The tension will allow the slide to come back to a hom e posi-
          tion as well as prov ide a littl e pressure for the pen as it travels over
          the wo rk area (see Figure 11.7).

          The main objective of the springs is to maintain consistent posi-
          tioning for trave l. If the springs aren't used, the slide may not
          come back to its original posi tion or it will not drop down to make
          contact with the pape r on the work area. WARNING: Don 't use
          strong springs-the pen will not last if too much pressure is
          applied while it is plotting. See the weak springs installed in
          Figure 11.8.