370                   CHAPTER THIRTEEN

                TABLE 13.1 Facility Capacity and Number of Centrifuges
                Facility size,   Dewatering    Centrifuges operating
                     3
                Mgd (m /d)      operation, h/d  Spare @ gal/min (L/s)
                 2 (7570)           7            1   1 @ 25 (1.58)
                5 (18,930)          7.5          1   1 @ 50 (3.16)
                20 (75,700)        15            2   1 @ 50 (3.16)
                50 (189,250)       22            2   1 @ 75 (4.73)
                100 (378,500)      22            3   2 @ 100 (6.31)
                250 (946,250)      22            4   2 @ 200 (12.62)
                  (Design Manual for Dewatering Municipal Wastewater Sludges, U.S. EPA)
             The sludge feed rate for the dewatering facility is
                                     gal/day of digested sludge
                Sludge feed rate                               (13.35)
                                operating h/day, 7 days/week (60 min/h)
           And the sludge weight flow rate is

                              (V)(p)(s.g.)(% solids)(60 min/h)
                         W s                                   (13.36)
                                      7.48 gal/ft 3
                 W   weight flow rate of sludge feed, lb/h (kg/h)
                   s
                  V   volume flow rate of sludge feed, gal/min (L/s)
                 s.g.   specific gravity of sludge
             % solids   percent solids expressed as a decimal
                                         3
                                                   3
                      density of water, 62.4 lb/ft (994.6 kg/m )
             Since the solids exiting the centrifuge are split between the centrate and the
           cake, it is necessary to use a recovery formula to determine solids capture.
           Recovery is the mass of solids in the cake divided by the mass of solids in the
           feed. If the solids content of the feed, centrate, and cake are measured, it is pos-
           sible to calculate percent recovery without determining total mass of any of the
           streams. The equation for percent solids recovery is
                                          F   C c
                                      C s
                              R   100  F  C s   C c            (13.37)
           where R   recovery, percent solids
                C   cake solids, percent solids (25%)
                 s
                F   feed solids, percent solids (5%)
                C   centrate solids, percent solids (0.3%)
                 c
             The dewatered sludge (cake) discharge rate is
           Cake discharge rate (lb/h) dry solids   (sludge feed rate, lb/h)(solids recovery)
                                                               (13.38)
   439   440   441   442   443   444   445   446   447   448   449