2.70   CHAPTER TWO
                         Outside corners or turns receive an additional strip of material usually 1 ft wide for
                      additional reinforcement (Fig. 2.90). Chalk lines should be used to keep vertical applica-
                      tions straight and to prevent fish mouthing of materials. All end laps, protrusions, and ter-
                      minations should be sealed with the clay mastic, as shown in Figs. 2.91 and 2.92. Proper
                      termination methods are shown in detail in Figs. 2.93 and 2.94.


























































                      FIGURE 2.90 Clay system applied to lagging detailing. Note reinforcement at corner. (Courtesy of TC
                      MiraDRI)