Page 452 - Construction Waterproofing Handbook
P. 452
11.8 CHAPTER ELEVEN
FIGURE 11.1 (Continued) Contractor or subcontractor qualification statement.
Finally, warranties provided by a contractor should cover both the labor and the mate-
rials. Questions to consider when reviewing a proposed warranty include:
● Will it cover material failure?
● Whose responsibility is it to uncover buried or covered systems?
● Are consequential damages (interior contents) covered?

