Page 229 - Decision Making Applications in Modern Power Systems
P. 229

Role of microphasor measurement unit Chapter | 7  193



                          P
                         µP U1         µ P M U        µ P M U
                           M
                               1
                             U
                                       µPMU22
                                                      µPMUn
                                 Acquire phase angle information of
                                   various points from µPMU
                                 Calculate the impedances between
                                various points by suitable algorithms


                            Yes
                                   Is impedance < Threshold ?

                                             No
                                                           Send fault
                                                          decisions to
                                  Compare impedances to get the
                                      faulted line section  other
                                                          substations
             FIGURE 7.8 Flowchart of the proposed algorithm.


                                              Tie switch 1

                                        14  15
                                             Tie switch 2



                          1   2  3   4  5   6  7    8  9  10  11
                                                     Tie switch 3

                                        12  13
             FIGURE 7.9 Reconfiguration possibilities in a typical distribution system.

                switches. It is generally done to transfer loads from heavily stressed fee-
                ders to less stressed feeders to avoid overloading failures. It is also done
                to manage power restoration after a fault scenario. It is a multiobjective
                as well as complex procedure, and the algorithms should be quick enough
                to handle several load flow calculations making the decisions in a timely
                manner.
                   Reconfiguration by manual labor is a time-consuming task and techni-
                cally infeasible. An automated reconfiguration procedure will need an
                array of sensors to acquire the magnitude data of voltages. Even if the
                magnitude data on each side of breaker is acquired by suitable data
                acquisition systems, there is a need for phase angle information. If the
   224   225   226   227   228   229   230   231   232   233   234