Page 397 - Decision Making Applications in Modern Power Systems
P. 397
Maintenance management with application Chapter | 13 359
FIGURE 13.13 Iron 3 vibration.
FIGURE 13.14 Copper versus vibration.
13.6 Case study (fuzzy logic with predictive maintenance)
1. Vibration analysis
Equipment status control is performed based on a calculated global
value for the vibration signal measured at critical points on the machine
surface. Since this value is due to a response signal from the structure to