362 Decision Making Applications in Modern Power Systems
variations caused by excess electric current in the furnace motor/
generator 01 be with the hot spot and it will not be able to predispatch
cargo.
a. Fuzzy logic goes into the operating conditions of the equipment
In Fig. 13.20, we can identify the anomalies likely to occur in the electric
motor of the generator 1 for all effects of temperature caused by excessive
electric current. The heating screen of Fig. 13.21 indicates that the engine/
generator 1 cannot be related for preloading under operating plants.
The other motors and generators are in the normal comfort area (A) and can
be classified for normal operation of the diffuse rule, such as the
motors and tuners 2, 3, 4, 5, 6, 7, 8, 9, and 10. 5 and 25 mark as normal
operations without interruption and execution of restriction only for the
motor/generator 1. Activate the excluded points in your electronic
connection.
In Fig. 13.20 the parameters for the location of the equipment, according
to the engine/generator 1, are not allowed to operate because they are not in
good operating condition. The other engines and generators are located in
the area A (N) Normal, 2, 3, 4, 5, 6, 7, 8, 9, and 10 and are able to position
themselves according to the needs of the organization. Fig. 13.21 informs,
which engines are conditional ideal for preshipment of cargo under operating
conditions.
FIGURE 13.20 Copper content in the lubricating oil (2016).