Page 142 - Drilling Technology in Nontechnical Language
P. 142
Chapter 5 – RIG SELECTION AND RIG EQUIPMENT 133
Fig. 5–18. Hoisting system schematic
Rotary equipment
As well as controlling movement of the drillstring up and down, it is
necessary to be able to rotate the drillstring. There are several ways of
achieving this rotary movement.
At the top of the rig substructure and the bottom of the derrick is a
platform called the drill floor, as explained previously. This is where the
rig crew works most of the time while tripping pipe in or out of the hole,
drilling, logging, and for most other operations (fig. 5–19). Somewhere in
the middle of the drill floor, directly underneath the crown and traveling
blocks, is a piece of equipment called the rotary table (fig. 5–20).