Page 379 - Drilling Technology in Nontechnical Language
P. 379

370             Drilling Technology in Nontechnical Language Second Edition






                  program writing for offshore       overview, 86
                     development well, 92         well proposal, 34–36
                  status at completion, 46, 51–52    contents, 36–37
                  template, 85                    well test, 82. See also production testing
              well control                           burning oil from, 248–249
                  blowout preventer stack, 258–267   information, 46, 51
                  certification of personnel for, 282  wellbore

                  high-angle/horizontal well killing,   position surveying tools, 188–189
                     277–278                         stability, 195
                  high-pressure, high-temperature    surveying calculations, 190–192
                     wells, 279–280               wellbore deviation
                  kick detection equipment, 268–269  jetting, 178–179
                  killing the well, 269–274          overview, 178
                  overview and summary, 255, 282     rotary drilling assemblies, 183–186
                  primary, 255–256                   rotary steerables, 186–188
                  relief wells, 280                  steerable motors, 181–183
                  secondary, 256–258                 whipstock, 179–180
                  shallow gas, 274–277            wellhead, 38, 41, 76
                  special considerations, 277–282  wellhead configuration, 38, 41–42

                  tertiary, 258                      simple land, 42, 43
                  underbalanced drilling, 281–282    spool-type, 42, 43–44
              well cost                              subsea, 42, 43
                  contingency costs, 297, 298     wellhead housing
                  depth-dependent costs, 297         latched onto blowout preventer, 94,
                  elements cost codes, 295, 296          95

                  fixed costs, 295                    latching profile of subsea, 94, 95

                  percentage saved, 290           wellsite
                  support costs (overheads), 297     decision making at, 292–293
                  time-dependent costs, 295          geologist, 286
              well cost estimation                wellsite drilling engineer (WSDE), 286
                  accuracy of, 297–298, 299       wellsite drilling petroleum engineer
                  by category, 295–298               (WSPE), 286
                  with cost codes, 296            whipstock, 179–180

                  final total and summary, 298, 299  widow maker, 117
                  overview, 295                   wireline

              well design, 37                        fishing tools, 326
                  casings, 38, 40–41                 logging (conventional), 246–247
                  completion, 38–40                  ranging tools, 280
                  directional profile, 38, 41, 42  workover hoists, 110


                  well fluids, 38, 44–45           Wytch Farm development well, 174, 193

                  wellhead configuration, 38, 41–44
              well kill. See also killing the well
                  high-angle/horizontal, 277–278
                  phase 1 of deviated, 278
              well planning, 17–20
              well planning (offshore well)
                  completion design, 86–89







         _Devereux_Book.indb   370                                                 1/16/12   2:13 PM
   374   375   376   377   378   379   380