Page 374 - Drilling Technology in Nontechnical Language
P. 374

INDEX                                                            365






                    over water work, 338            pore fluid sampling, 238–239

                    overview, 338                   pore pressure prediction, 19–20
                    tank entry, 338                 porosity, 10, 24
                 personal protective equipment (PPE),   Portland cement, 208
                    340, 341                        potassium chloride (KCI), 170

                 personnel certification, for well control,   prejob safety meeting, 332–333
                    282                             prespud meetings, 330–331
                 persons on board (POB) list, 336   pressure coring, 236
                 petroleum. See oil                 pressure curve, 252–253
                 phase 1, 273                       pressure regulator, 265
                    deviated well kill, 278         pressure testing, 238–239
                    vertical well kill, 273         pretour meetings, 332
                 physical sampling at surface       primary migration, 25
                    mineral attributes, 229–232     primary well control, 255–256
                    mud logging, 232–233                restoring, 257–258
                    overview, 227, 228–229          principal stresses, 13–14
                 physical sampling down hole        production casing, overview, 200–201
                    bottomhole coring, 234–236      production hole section drilling, 77–79

                    coring classifications, 233–234  production testing, 227
                    explosive sidewall coring, 237–238  choke, 251
                    overview, 227, 233                  derivative curve, 252–253

                    pore fluid sampling and pressure     drawdown, 251–252
                        testing, 238–239                information produced by, 250–251
                    rotary sidewall coring, 238         overview, 249–253
                 pilot hole, 58                         pressure curve, 252–253
                 pin, 138                               transient test, 252
                 pipe body, 62                          well pressure vs. time during
                 pit drill (kick drill), 337               drawdown graph, 251
                 pit volume totalizer (PVT), 128, 268  production testing (land well)
                 plan view, 49                          killing the well after, 83
                 plate tectonics, 4–6                   overview, 80
                 platform                               perforating well, 82
                    overview, 121–122                   preparing for test string, 80–81
                    self-contained rig package, 121     running test string, 81–82
                    tension leg platform, 122           testing well, 82

                 plug. See also cement plugs        prospect identification, 33–34
                    diesel oil bentonite, 310–311

                    flow, 168, 169
                    gunk, 310                          R
                 polycrystalline diamond compact (PDC)
                    bits, 103, 141, 143–144, 145    radio operator, 287
                    core bit, 235                   radioactivity tools, 243
                    showing nozzles, 149            ram-type preventer
                 polycrystalline diamond compact (PDC)   blind rams, 260
                    drilling, 103                       blind-shear rams, 260
                 polymers, 159–160                      in blowout preventer stack, 262
                 pontoons, 115                          casing shear rams, 260







        _Devereux_Book.indb   365                                                 1/16/12   2:13 PM
   369   370   371   372   373   374   375   376   377   378   379