Page 373 - Drilling Technology in Nontechnical Language
P. 373

364             Drilling Technology in Nontechnical Language Second Edition






                  mud rheology, 167–168              spudding well and cementing
                  sand content, 167                      conductor, 93
              mud pumps, triplex, 124                for surface casing, 94–97
              mud system, active, 126–128            suspending well, 107
              multilateral wells, 193                tangent section, 100–102
              multiphase reservoirs, 29           oil
              multiple wells                         accumulation, 21
                  drilling from single location, 192  generation, 22–23
                  single surface location for, 173–174  on mud returned from well, 230
                                                     muds, 157, 161–162
                                                  oil migration, 21, 22
                  N                                  primary, 25
                                                     secondary, 28–29
              natural diamond bits, 141, 143, 144, 145  oil wet, 29
              near bit stabilizer (NB stab), 184  oil window, 22
              neat class G cement, 209            operations manager, 284
              newcomers on rig, and safety, 333–334  operators, 348
              night drilling supervisor, 286      orientated coring, 236
              night toolpusher, 287               outside catch tools
              nipple down, 67                        die collar, 321, 322–323
              nipple up, 67                          overshot, 321–322
              nondispersed muds, 156, 159–160        overview and types, 321
              nozzle pockets, 149                 outside diameter (OD), 136
                                                  over water work, 338
                                                  overburden, 12
                  O                               overgauge hole, 61
                                                  overheads, 297
              offshore development well           overpressured, 16
                  drilling, 92–107                overshot, 321–322
                  hole and casing sizes, 90–91
                  overview and summary, 85–86, 108
                  planning, 86–89                    P–Q
                  writing well program, 92
              offshore installation manager (OIM),   packed assembly, 185
                  287, 351                        packed off, 315
              offshore rig                        packer fluid, 44

                  discharge and spills minimization,   packing, 259
                     343                          pendulum assembly, 184, 185
                  helicopter landing on, 334      perforating, 80
                  newcomers and safety, 333–334   perforating well, 82
              offshore well drilling              perforation charges, 201
                  bringing well to horizontal, 104–106  permeability, 10, 24
                  heave compensator, 97–98           directional, 27
                  horizontal section, 106–107        reservoir, 26–27
                  kicking off well, 98–100        permit to work (PTW) systems
                  locating casing point, 102–103     electrical work, 338
                  logging, 103–104                   hot work, 338







         _Devereux_Book.indb   364                                                 1/16/12   2:13 PM
   368   369   370   371   372   373   374   375   376   377   378