Page 370 - Drilling Technology in Nontechnical Language
P. 370

INDEX                                                            361






                    I                                  K

                 igneous rocks, 1                   kelly, 135, 136
                 incentive scheme, 290              kick, 16, 127, 256, 258
                    attributes, 292                     tolerance, 279
                 incentive scheme features          kick detection equipment


                    lump sums for flat-time operations,   flow indicator, 268
                        291                             overview, 268–269
                    meeting specific targets, 290        pit volume totalizer, 268

                    percentage of well cost saved, 290  kick drill (pit drill), 337
                    safety, 290                     kickoff, of offshore well, 98–100
                 incidents                              second kickoff point, 104–105
                    handling, 300–301               kill
                    response team, 300                  dynamic, 275–276
                 inclination, 91                        line, 263
                 induction                          killing the well, 16. See also well kill
                    logs, 240                           overview, 269
                    tools, 240                          after production testing, 83
                 influx density gradient, 270–271        wait and weight (balanced method),

                 infrastructure checking (land well), 54   269–274
                 inhibit, 8                             work through example, 269–274
                 insert bushings, 134–135           Kinley caliper, 243, 245
                 inside catch tools
                    overview and types, 323
                    releasing spear, 323               L
                    taper tap, 323
                 inside diameter (ID), 57           land exploration well
                 intermediate casing, 72                abandoning, 83
                    overview, 200                       completed, 79
                    running and cementing first, 74–77   drilling, 52–80

                 internal blowout, 272                  drilling program, 37, 45–51
                 invert oil emulsion muds, 157, 161–162  overview and summary, 33, 84
                                                        production testing, 80–83
                                                        prospect identification, 33–34

                    J                                   well design, 37–45
                                                        well proposal, 34–37
                 jackup rig, 119                    land rig
                    on location, 120                    blowout preventer, 262
                    under tow, 120                      blowout preventer control system,
                 jars and jarring, 319–320                 265
                 jet junk retriever, 324                desert, 111
                 jetting, 178–179                       diverter attaching, 56–57
                 junk                                   heavy, 110–111
                    drilling, milling and smashing,     helicopter transportable (heli-rig),
                        325–326                            112
                    in stuck pipe, 317                  light, 111–112








        _Devereux_Book.indb   361                                                 1/16/12   2:13 PM
   365   366   367   368   369   370   371   372   373   374   375