Page 369 - Drilling Technology in Nontechnical Language
P. 369

360             Drilling Technology in Nontechnical Language Second Edition






              flow indicator, 268                     H


              fluids, 15–16

              fluid pressures, 14                  heat checking, 150
              foamed muds, 157, 164               heave compensator, 97–98
              foot-pounds, 139                    heaves, 97
              formation. See also reservoir formation   heavy land rig, 110–111
                  (oil/gas)                       heli-rig, 112
                  losses in fractured, 310, 317   high-pressure, high-temperature (HPHT)
                  losses in normally pressured,      wells, 279–280
                     deeper, 308–310              high-pressure pumping equipment,
                  reactive, 316                      124–126
                  strength testing, 67–70         hoisting equipment
                  surface hole losses in high        crown block, 132, 133
                     permeability, 304–307           derrick, 132, 133
              four-arm caliper, 103, 104             drawworks drum, 132, 133
              fracture                               schematic, 133
                  losses in formations with, 310, 317  sensator, 132
                  surface hole losses and, 304, 305,   weight indicator, 132
                     307–308                      hoists, workover, 110
              fracture pressure, 14               hole
                  prediction, 19–20                  cleaning, 194
              free-point indicator (FPI), 244        logging the, 80
                                                     opener, 65
                                                     sizes (offshore well), 90–91
                  G                               hole section (land well)

                                                     drilling first, 61–65
              gamma ray (GR) log, 241                drilling first intermediate, 70–72

              gas cap, 29                            drilling notes for, 46, 49
              gas drive, 30                          drilling production, 77–79
              gas lift, 30                        horizontal drilling. See directional
              gauge cutters, 143                     drilling
              geology                             hot work, 338
                  drilling, 1–20                  Huisman LOC 400 casing drilling rig,

                  hydrostatic pressure and fluids,    113, 114
                     14–16                        hydrates, 280
                  input to drilling wells, 17–20  hydraulic horsepower (HHP), 125
                  lithology, 7–12                 hydrocarbons, 21
                  plate tectonics, 4–6            hydrocarbon generation, 22–23
                  rock origins, 1–4               hydroclones, 130
                  rock strengths and stresses, 12–14  hydrogen sulfide (H S), 31, 172, 204,

              geometry-related stuck pipe, 313–315   336          2
              geosteering, 175, 193–194              drill, 337
              grapple, 321                        hydrostatic pressure, 14–16
              green cement, 317
              gunk plug, 310
              gyro multishot survey, 189








         _Devereux_Book.indb   360                                                 1/16/12   2:13 PM
   364   365   366   367   368   369   370   371   372   373   374