Page 348 - Fair, Geyer, and Okun's Water and wastewater engineering : water supply and wastewater removal
P. 348

JWCL344_ch09_297-332.qxd  8/2/10  9:54 PM  Page 308







                    308  Chapter 9  Cross-Connection Control
                    9.2.10 Health Problems Due to Cross-Connection in an Office Building

                                         A cross-connection incident that occurred in a modern seven-story office building located
                                         in a large city in New Hampshire resulted in numerous cases of nausea, diarrhea, loss of
                                         work time, and employee complaints as to the poor quality of the water.
                                             On a Saturday, a large fire occurred two blocks away from a seven-story office build-
                                         ing in a large New Hampshire city. On Sunday, the maintenance crew of the office building


                                                                             Roof mounted solar panels




                                                                                 Heat exchanger
                                                                         Utility
                                                                         sink










                                                                                       Sink




                                                                      Sink



                                                                                        Coffee
                                                                                       machine







                                                                      Sink




                                                                                                 Chemical
                                                                    Water                         feeder
                                                                   fountatin

                                                                  Booster pump

                                                                  Meter
                    Figure 9.10 Cross-
                                                     Water main
                    Connection in a Modern                                                     Backpressure
                    Seven-Story Office Building                         Recommended installation  backflow
                    in New Hampshire                                     of backflow preventers
   343   344   345   346   347   348   349   350   351   352   353