Page 360 - Forensic Structural Engineering Handbook
P. 360

TEMPORARY STRUCTURES IN CONSTRUCTION         10.47



































                                             (b)
























                                             (c)
                 FIGURE 10.9  Huntington wall. (Continued) (b) Remnant of collapsed wall. (From R. T. Ratay
                 Engineering, P.C.) (c) “Orderly line-up” of collapsed masonry on the ground. (From R. T. Ratay
                 Engineering, P.C.)
   355   356   357   358   359   360   361   362   363   364   365