Page 108 - Formulas and Calculations for Petroleum Engineering
P. 108

Drilling engineering formulas and calculations Chapter  2  101



             Formula(s)

                                                            65:5 MW
                                                      L    ¼
                                                        max
                                                               65:5
                                                                              !
                                                                           BF
                                             Depth ¼ T   fð½  Þ MOP W bha Š
                                                  t
                                                                          W
                                                                            dp
             Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, second edition,
             Gulf Professional Publishing, Page: 43.


             2.61    Drilled gas entry rate

             Input(s)

                d b :  Bit Diameter (in.)
                R:   Penetration Rate (ft/h)
                S g :  Gas Saturation (fraction)
                Ø:   Formation Porosity (per cent)
                p:   Pressure (psi)
                z:  Gas Compressibility Factor (dimensionless)
                t:  time (h)



             Output(s)

                q gsc :  Drilled Gas Entry Rate (SCF/min)



             Formula(s)

                                                              2
                                                             d RØS p
                                                                  g
                                                              b
                                                        q  ¼
                                                         gsc
                                                              310 zT
             Reference: Watson, D., Brittenham, T., & Moore, P. L. (2003). Advanced Well Control (Vol. 10). Society of Petroleum
             Engineers., Page: 19.


             2.62    Drilling cost per foot
             Input(s)
                B:   Bit Cost ($)
                C R :  Rig Cost ($)
                T:   Rotating Time (spm)
                t:  Round Trip Time (spm)
                F:F   ootage per Bit (ft)




             Output(s)
                C T :Drilling Cost ($)
   103   104   105   106   107   108   109   110   111   112   113