Page 118 - Formulas and Calculations for Petroleum Engineering
P. 118

Drilling engineering formulas and calculations Chapter  2  111



             Formula(s)


                                                      ð
                                                                      ð
                                                 QM   MW  POÞ QW   PO PWÞ
                                            QU ¼
                                                             PU  PO
                                                             35 PU
                                                FU ¼
                                                               QW
                                                     35 MW +        35 PWð  Þ
                                                               QM
                                                            QM   QU   FUÞ
                                                                 ð
                                                  QC ¼ CC
                                                                  42
                                                                 ð
                                                            QM   QU   FUÞ
                                                  QD ¼ CD
                                                                  42
                                                      ð
                                                           ð
                                     ð QM   35 MWÞÞ  QU   35 PUÞÞ 0:6129   QC 0:6129   QD
                                          ð
                                QP ¼
                                                             35 PW
                                                                  QC   QD

                                            QB ¼ QM  QU  QP                   35
                                                                  21:7  21:7
             Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 99.
             2.84    Evaluation of hydrocyclone
             Input(s)
                MW:    Average Density of discarded mud (ppg)
                V:   Volume of Slurry sample collected (quarts)
                T:   Time to collect slurry sample (s)


             Output(s)
                SF:   Fraction percentage of solids (fraction)
                MS:    Mass rate of solids removed by one come of a hydroclone (lb/h)
                WR:    Volume of wate ejected by one cone of a hydroclone (gal/h)


             Formula(s)

                                                            MW  8:33
                                                       SF ¼
                                                              13:37
                                                                     V
                                                      MS ¼ 19530   SF
                                                                     T
                                                                      V
                                                    WR ¼ 900   1 SFÞ
                                                              ð
                                                                      T
             Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 97.

             2.85    Fluid volume required to spot a plug

             Input(s)

                L t :  Length of Tubing or Pipe (ft)
                L p :  Length of Plug (ft)
                C t :  Tubing or Pipe Capacity (bbl/ft)
                V s :  Spacer Volume behind Slurry (bbl)