Page 122 - Formulas and Calculations for Petroleum Engineering
P. 122

Drilling engineering formulas and calculations Chapter  2  115



             Output(s)

                r m :  Gas/Mud Ratio (SCF/bbl)

             Formula(s)

                                                             2
                                                            d RØS p
                                                             b    g
                                                        r ¼
                                                         m
                                                            310 zTq
                                                                   m
             Reference: Watson, D., Brittenham, T., & Moore, P. L. (2003). Advanced Well Control (Vol. 10). Society of Petroleum
             Engineers, Page: 19.

             2.93    Gel strength—Optimal solid removal efficiency

             Input(s)
                V s :  Expected Drilled Solids in Drilling Fluid (fraction)
                V c :  Drilled Solids in Discard (fraction)

             Output(s)
                Z sr :  Optimal Solid Removal Efficiency (fraction)


             Formula(s)

                                                          0             1
                                                               1 V
                                                          B         s   C
                                                  Z ¼ 1   B             C
                                                    rs
                                                          @         V c  A
                                                            1 V +
                                                                s
                                                                    V s
             Reference: Samuel. E Robello. 501 Solved Problems and Calculations for Drilling Operations. Sigma Quadrant. 2015.
             Houston, Texas, Page: 192.
             2.94    Gel strength—Solid control efficiency

             Input(s)
                V r :  Fraction of the Solids Removed (unitless)
                V h :  Hole Volume (BBL)
                V d :  Volume of Solids Discarded (BBL)


             Output(s)
                (Z s )ce:  Solid Control Efficiency (fraction)


             Formula(s)

                                                                   V d
                                                       ðÞce ¼ V Þ
                                                              ð
                                                         s      r
                                                       Z
                                                                   V
                                                                     h
             Reference: Samuel. E Robello. 501 Solved Problems and Calculations for Drilling Operations. Sigma Quadrant. 2015.
             Houston, Texas, Page: 191.
   117   118   119   120   121   122   123   124   125   126   127