Page 125 - Formulas and Calculations for Petroleum Engineering
P. 125

118 Formulas and calculations for petroleum engineering



              2.99   Hydromechanical specific energy

              Input(s)
                 WOB:    Weight on Bit (lbf)
                                  2
                 A b :  Area of Bit (ft )
                 N:   Rotational Speedfor a Bit (ft/s)
                 Z:  Factor for Energy Reduction (dimensionless)
                 P b :  Presure Drop Across Bit (psi)
                                3
                 Q:   Flow Rate (ft /s)
                 ROP:   Rate of Penetration (s/ft)
                 T:  Torque (lbf ft)



              Output(s)
                                                            2
                 HMSE:    Hydro Mechanical Specific Energy (lbf/ft )


              Formula(s)

                                               WOB      120   3:142   N   T + 1154   Z   P   Q

                                                                                  b
                                      HMSE ¼         +
                                                A                  A   ROP
                                                 b                   b
              Reference: Samuel. E Robello. 501 Solved Problems and Calculations for Drilling Operations. Sigma Quadrant. 2015.
              Houston, Texas, Page: 415.



              2.100 Hydrostatic pulling

              Input(s)
                 NS:   Number of Stands Pulled (number)
                 Lavg:  Average length per stand (ft)
                 PD:   Pipe Displacement (bbl/ft)
                 mw:   Mud Weight (ppg)
                 cc:  Casing Capacity (bbl/ft)
                 pd:  Pipe Disp. (bbl/ft)



              Output(s)

                 BD:   Barrel Displaced (bbl)
                 HP:   Hydrostatic Pressure Decrease (Pulling Dry Pipe out of the Hole) (psi)



              Formula(s)


                                                      BD ¼ NS   Lavg   PD
                                                                     mw
                                                    HP ¼ BD   0:052
                                                                   cc pd


              Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 20.
   120   121   122   123   124   125   126   127   128   129   130