Page 128 - Formulas and Calculations for Petroleum Engineering
P. 128

Drilling engineering formulas and calculations Chapter  2  121



             Formula(s)

                                                          C2a ¼ v1

                                                          C2b ¼ v1
                                                  v2a ¼ 0:5   C1   1 + cos yðÞÞ
                                                                ð
                                                              ð
                                                    v2b ¼ C1   1  cos yðÞÞ
             Reference: Transport Phenomena, Second Edition, Bird, Page: 201.

             2.106 Increase mud density by barite

             Input(s)
                W 1 :  Initial Mud wt. (ppg)
                W 2 :  Required mud wt (ppg)

             Output(s)

                B:   Sacks of barite required per 100 bbl (stroke/100bbl)

             Formula(s)


                                                               W  W  1
                                                                 2
                                                      B ¼ 1470
                                                               35 W
                                                                     2
             Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 81.

             2.107 Increase mud density by calcium carbonate

             Input(s)
                W 1 :  Initial Mud wt. (ppg)
                W 2 :  Required mud wt (ppg)

             Output(s)

                B:   Sacks of Calcium Carbonate required per 100 bbl (stroke/100bbl)

             Formula(s)

                                                              W  W   1
                                                                2
                                                      B ¼ 945
                                                              22:5 W
                                                                     2
             Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 82.

             2.108 Increase mud density by hematite

             Input(s)
                W 1 :  Initial Mud wt. (ppg)
                W 2 :  Required mud wt. (ppg)
   123   124   125   126   127   128   129   130   131   132   133