Drilling engineering formulas and calculations Chapter 2 123
Output(s)
V: Volume increase per 100 bbl (bbl/100bbl)
Formula(s)
W W 1
2
V ¼ 100
40 W 2
Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 82.
2.112 Initial volume required to achieve a volume with barite
Input(s)
W 1 : Initial Mud wt. (ppg)
W 2 : Required mud wt. (ppg)
V f : Final Volume (ppg)
Output(s)
V i : Starting Volume (bbl)
Formula(s)
35 W 2
V ¼ V
i f
35 W 1
Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 82.
2.113 Initial volume required to achieve a volume with calcium carbonate
Input(s)
W 1 : Initial Mud wt. (ppg)
W 2 : Required mud wt. (ppg)
V f : Final Volume (ppg)
Output(s)
V i : Starting Volume (bbl)
Formula(s)
22:5 W 2
V ¼ V
i f
22:5 W
1
Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 83.