Page 132 - Formulas and Calculations for Petroleum Engineering
P. 132

Drilling engineering formulas and calculations Chapter  2  125



             Formula(s)

                                                             Q   H
                                                               f
                                                          P ¼
                                                           i
                                                              2545
             Reference: Samuel. E Robello. 501 Solved Problems and Calculations for Drilling Operations. Sigma Quadrant. 2015.
             Houston, Texas, Page: 6.


             2.117 Jet velocity—Nozzle hydraulic analysis

             Input(s)
                Q:   Flow Rate (GPM)
                F:   Jet Size (1) (in.)
                C:   Jet Size (2) (in.)
                B:   Jet Size (3) (in.)



             Output(s)
                v c :  Jet Velocity (ft/s)



             Formula(s)

                                                            417:2   Q
                                                       v ¼
                                                        c   2   2   2
                                                           F +C +B
             Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition,
             Gulf Professional Publishing, Page: 170.



             2.118 Kick analysis—Influx

             Input(s)
                SICP:   Shut in Casing Pressure (psi)
                SIDPP:   Shut in Drill Pipe Pressure (psi)
                h i :  Height of Influx (ft)
                mw:    Mud weight (ppg)



             Output(s)

                I:  Influx (ppg)


             Formula(s)

                                                            SICP SIDPP
                                                    I ¼ mw
                                                              h   0:052
                                                               i

             Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 127.
   127   128   129   130   131   132   133   134   135   136   137