Page 134 - Formulas and Calculations for Petroleum Engineering
P. 134
Drilling engineering formulas and calculations Chapter 2 127
Formula(s)
0:5
KWM
* *
MSP ¼ 0:2 P V
C
Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 129.
2.122 Kick analysis—Shut-in drill pipe pressure
Input(s)
P fp : Formation Pressure (psi)
mw: Mud weight (ppg)
h: height (ft)
Output(s)
SIDPP: Shut in Drill Pipe Pressure (psi)
Formula(s)
ð
SIDPP ¼ P mw 0:052 hÞ
fp
Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 131.
2.123 Kick analysis—Height of influx
Input(s)
PG: Pit Gain (bbl)
AC: Annular Capacity (bbl/ft)
Output(s)
h: Height of Influx (ft)
Formula(s)
PG
h ¼
AC
Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 126.
2.124 Kill weight mud determination—Moore equation
Input(s)
SIDPP: Shut-in Drill Pipe Pressure (psi)
OMW: Original Mud Weight (ppg)
TVD: True Vertical Depth (ft)