Page 139 - Formulas and Calculations for Petroleum Engineering
P. 139

132 Formulas and calculations for petroleum engineering



              Output(s)

                 mw max :  Max Allowable Mud wt (ppg)


              Formula(s)

                                                               P
                                                    mw    ¼     l    + mw
                                                       max
                                                            0:052   tvd
              Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 120.


              2.135 Maximum drilling rate—Larger holes
              Input(s)

                 MW o :  Mud Weight out (ppg)
                 MW i :  Mud Weight in (ppg)
                 q c :  Circulation Rate (gpm)
                 D h :  Hole Size (in.)


              Output(s)

                 MDR:    Maximum Drilling Rate (ft/h)


              Formula(s)

                                                        67   MW  MW Þ   q  c
                                                            ð
                                                                       i
                                                                o
                                                  MDR ¼           2
                                                                 D
                                                                  h
              Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition,
              Gulf Professional Publishing, Page: 19.

              2.136 Maximum equivalent derrick load
              Input(s)

                 F h :  Load Hoisted (lb)
                 n:  No. of Lines Strung Between Crown Block and Traveling Block (unitless)


              Output(s)

                 F de :  Maximum Equivalent Derrick Load (lb)


              Formula(s)


                                                             n+ 4
                                                       F ¼           F
                                                        de           h
                                                               n
              Reference: Samuel. E Robello. 501 Solved Problems and Calculations for Drilling Operations. Sigma Quadrant. 2015.
              Houston, Texas, Page: 11.
   134   135   136   137   138   139   140   141   142   143   144