Page 262 - Formulas and Calculations for Petroleum Engineering
P. 262

Production engineering formulas and calculations Chapter  4  255



             Formula(s)

                                                             144   A a
                                                        C  ¼
                                                         FL  5:615   ρ


             Reference: Ahmed, T., McKinney, P.D. 2005. Advanced Reservoir Engineering, Gulf Publishing of Elsevier, Chapter: 1,
             Page: 49.



             4.113 Wellhead pressure (multiphase flow across the choke)
             Input(s)

                C:   Emprical Constant (dimensionless)
                n:   Emprical Constant (dimensionless)
                m:   Emprical Constant (dimensionless)
                R:   Producing Gas Liquid Ratio (SCF/BBL)
                S:   Choke Size (1/64 in.)
                q:   Gross Liquid Rate (bbl/d)



             Output(s)
                P wh :  Upstream Wellhead Pressure (psi)



             Formula(s)

                                                                   q
                                                                m
                                                       P wh  ¼ C   R
                                                                   S n
             Reference: Boyun, G., William, C., & Ali Ghalambor, G. (2007). Petroleum Production Engineering: A Computer-Assisted
             Approach, Page: 5/64.



             4.114 Workover operations (maximum allowed tubing pressure)

             Input(s)
                FG:   Fracture Gradient (psi/ft)
                P t :  Tubing Pressure (psi)
                H:   Depth of Perforations (ft)



             Output(s)
                MATP:    Maximum Allowable Tubing Pressure (psi)



             Formula(s)

                                                     MATP ¼ FG   H  P t


             Reference: Petrowiki.org.
   257   258   259   260   261   262   263   264   265   266   267