Page 81 - Formulas and Calculations for Petroleum Engineering
P. 81
74 Formulas and calculations for petroleum engineering
Output(s)
V: Accumulator Capacity (gallon)
Formula(s)
P P P P
V ¼ BC
P f P S
Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition,
Gulf Professional Publishing, Page: 39.
2.2 Accumulator precharge pressure
Input(s)
V a : Total Accumulator Volume (bbl)
P S : Starting Accumulator Pressure (psi)
V r : Volume of Fluid Removed (bbl)
P f : Final Accumulator Pressure (psi)
Output(s)
P: Accumulator Pressure (psi)
Formula(s)
V r P P s
f
P ¼
V a P P f
s
Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition,
Gulf Professional Publishing, Page: 41.
2.3 Amount of additive required to achieve a required cement slurry density
Input(s)
r: Required Slurry Density (lb/gal)
S Gc : Specific Gravity of Cement (unitless)
C: Water Requirement of Cement (gal/stroke)
A: Water Requirement of Additive (gal/stroke)
S Ga : Specific Gravity of Additive (unitless)
Output(s)
x: Amount of Additive Required (lb/stroke)