Page 14 - Fundamentals of Gas Shale Reservoirs
P. 14

xii  CONTENTS

               16.5  Quantitative Interpretation of Imbibition Data,  352
                    16.5.1   Scaling Imbibition Data,  352
                    16.5.2   Modeling Imbibition Data,  352
               16.6  Estimation of Brine Imbibition at the Field Scale,  354
               16.7  Initial Water Saturation in Gas Shales,  356
               16.8  Conclusions,  356

            17  Gas Shale Challenges over the Asset Life Cycle                   361
               17.1  Introduction,  361
               17.2  The Asset Life Cycle,  361
                    17.2.1   Exploration Phase Objectives—Recommended Practices,  361
                    17.2.2   Appraisal Phase Objectives—Recommended Practices,  362
                    17.2.3   Development Phase Objectives—Recommended Practices,  362
                    17.2.4   Production Phase Objectives—Recommended Practices,  362
                    17.2.5   Rejuvenation Phase Objectives—Recommended Practices,  362
               17.3  Exploration Phase Discussion,  362
                    17.3.1   Screening Study—Current Practice,  362
                    17.3.2   Screening Study Recommended Practices,  363
                    17.3.3   Reservoir Characterization—Current Practice,  363
                    17.3.4   Reservoir Characterization—Recommended Practices,  363
                    17.3.5   Determining Initial Economic Value and Reservoir Potential,  365
               17.4  Appraisal Phase Discussion,  365
                    17.4.1   Drill Appraisal Wells—Current Practice,  365
                    17.4.2   Drill Appraisal Wells—Recommended Practices,  365
                    17.4.3   Build Reservoir Models for Simulation—Current Practice,  365
                    17.4.4   Build Reservoir Models for Simulation—Recommended Practices,  365
                    17.4.5   Generate a Field Development Plan—Current Practice,  366
                    17.4.6   Generate a Field Development Plan—Recommended Practices,  366
                    17.4.7   Validate Economics of the Play or Pilot Project,  366
               17.5  Development Phase Discussion,  367
                    17.5.1   Implement the Field Development Plan,  367
                    17.5.2   Surface Facilities,  367
                    17.5.3   Design Wells and Optimize Drilling Costs—Current Practice,  367
                    17.5.4   Design Wells and Optimize Drilling Costs—Recommended Practice,  368
                    17.5.5     Refine and Optimize Hydraulic Fracturing and Wellbore Completion
                            Design—Current Practices (Characterize the Lateral),  369
                    17.5.6   Current Hydraulic Fracturing Practices,  369
                    17.5.7   Hydraulic Fracturing—Recommended Practices,  370
                    17.5.8   Characterize the Lateral,  372
                    17.5.9   Current Wellbore Completion Practice,  373
                    17.5.10  Wellbore Completion—Recommended Practices,  373
                    17.5.11  Drilling Considerations for Completion Methods,  375
                    17.5.12  Fracturing Considerations for Completion Method,  375
               17.6  Production Phase Discussion,  375
                    17.6.1   Monitor and Optimize Producing Rates—Current Practice,  375
                    17.6.2   Monitor and Optimize Producing Rates—Recommended Practices,  375
                    17.6.3   Manage the Water Cycle—Recommended Practices,  376
                    17.6.4   Preventing Corrosion, Scaling, and Bacterial Contamination in Wells and Facilities,  376
                    17.6.5   Protecting the Environment,  376
               17.7  Rejuvenation Phase Discussion,  376
               17.8  Conclusions—Recommended Practices,  377
   9   10   11   12   13   14   15   16   17   18   19