FEWER HIGHER-LEVEL CERTIFICATIONS  87



                        TABLE 5.3  REGISTRATIONS AND CERTIFICATIONS FOR OTHER LEED RATING
                        SYSTEMS §§

                        RATING SYSTEM             REGISTERED*       CERTIFIED      PERCENTAGE
                        LEED-CS v. 1.0 (pilot)         110              28              25%
                        LEED-CS v. 2.0 †              1231              31               3
                        LEED-CI v. 1.0 (pilot)         106              30 ‡            28
                        LEED-CI v. 2.0 §               895 ¶           186              21
                        LEED-EB v. 1.0 (pilot)**        88              26              30
                        LEED-EB v. 2.0 ††              891 ‡‡           44               5
                        Totals                        1120             203              18

                        *Based on LEED registered projects listed in the USGBC web site, accessed May 30, 2007. These
                        totals are lower than those in the “LEED Metrics” list.
                        † LEED-CS v. 2.0 became effective in the spring of 2006, so it is only about 2 years old, not enough
                        time for most large projects to finish construction and certification.
                        ‡ Cumulative total as of mid-2007.
                        § In effect since October 2004.
                        ¶ Cumulative total as of mid-2005.
                        **End of 2004 registered projects total.
                        †† In effect since October 2004.
                        ‡‡ Cumulative total as of mid-2005.
                        §§ As of April 2008, data courtesy of USGBC.



                      have a strong incentive to proceed all the way from registration to certification.
                      However, in examining the “percentage completion” rate in Table 5.3, we see it’s no
                      greater than for the other LEED systems.


                      LEED FOR COMMERCIAL INTERIORS
                      LEED-CI represents a wholly different situation, with an average size of only 50,000
                      square feet (one or two floors of an office building) and a quick project turnaround
                      time. Most remodeling and tenant improvement projects happen quite fast, so that a
                      decision to pursue LEED-CI must be made at or near the outset of a project. In that
                      case, one expects the client and the design team to be committed to the end results.
                      However, a countervailing factor is that the average project cost is less than $5 million,
                      often less than $2 million, so that the fixed cost of completing a LEED-CI project
                      (perhaps $50,000 to $100,000) is a more significant factor in the overall project budget.
                      As a result, the percentage of registered projects already completed under LEED-CI ver-
                      sion 2.0 (in place since November of 2004) is less than that of LEED for New
                      Construction.  As an example, Exelon Corporation, a major electric utility, used
                      LEED-CI to fit out its new headquarters office space (Fig. 5.1).