SITE SELECTION AND SITE EVALUATION  175


































                        © Richard Mendelkorn, courtesy of Arrowstreet.


                        90.1-1999 energy standards would have been $3 per square foot ($68,000/year),
                        the estimated energy cost for the Epi-Center is $0.56 per square foot
                        ($12,732/year).  A 45-kilowatt photovoltaic system was designed to produce
                        58,000 kWh of electricity per year, 156 percent of the building’s electrical energy
                        needs and 32 percent of its total energy needs. Ceiling fans, operable windows,
                        and exhaust fans will be used for cooling since there is no refrigerant-based cooling
                        system in the building, a measure that will reduce the total electricity use by
                        65 percent.*





                      Site Selection and Site Evaluation


                      Paul Meyer, F. Otto Haas Director of Morris  Arboretum at the University of
                      Pennsylvania, describes the sensitive issues of site selection and site design for a high-
                      performance project: †



                      *U.S. Green Building Council [online], http://leedcasestudies.usgbc.org/overview.cfm?ProjectID=736, accessed
                      April 2008.
                      † Interview with Paul Meyer, Morris Arboretum, March 2008.