                                       The Use of Water in HVAC Systems

                    242   The HVAC World

                    8.9 Eliminating Energy Waste
                    During Commissioning
                    Every effort should be made in the design, testing, and initial opera-
                    tion of HVAC water systems to eliminate the waste of energy in such
                    systems. Typical of this is the testing and balancing procedures that
                    are used to commission a new chilled or hot water system. In the past,
                    a calibrated balance valve was used to check the flow through an indi-
                    vidual coil. This balance valve was adjusted until the design flow was
                    achieved through that coil. This is shown in Fig. 8.14a; Fig. 8.14b






















                               a. Calibrated balance valve to determine flow.


                                        Control valve
                               ∆P















                               b. Permanent loss of balance valve is eliminated
                               by measuring friction loss of coil or control valve
                               and determining flow from this data.
                    Figure 8.14 Testing for coil flow.




                 Downloaded from Digital Engineering Library @ McGraw-Hill (www.digitalengineeringlibrary.com)
                            Copyright © 2006 The McGraw-Hill Companies. All rights reserved.
                             Any use is subject to the Terms of Use as given at the website.
   240   241   242   243   244   245   246   247   248   249   250