The Use of Water in HVAC Systems
242 The HVAC World
8.9 Eliminating Energy Waste
During Commissioning
Every effort should be made in the design, testing, and initial opera-
tion of HVAC water systems to eliminate the waste of energy in such
systems. Typical of this is the testing and balancing procedures that
are used to commission a new chilled or hot water system. In the past,
a calibrated balance valve was used to check the flow through an indi-
vidual coil. This balance valve was adjusted until the design flow was
achieved through that coil. This is shown in Fig. 8.14a; Fig. 8.14b
a. Calibrated balance valve to determine flow.
Control valve
∆P
b. Permanent loss of balance valve is eliminated
by measuring friction loss of coil or control valve
and determining flow from this data.
Figure 8.14 Testing for coil flow.
Downloaded from Digital Engineering Library @ McGraw-Hill (www.digitalengineeringlibrary.com)
Copyright © 2006 The McGraw-Hill Companies. All rights reserved.
Any use is subject to the Terms of Use as given at the website.