Techno economic feasibility analysis of different combination of hybrid systems   207



               Problem is solved on the basis of balance of system and
                 cost per peak watt which is applied to village in West






                        capacity reduce area of PV system. The relationship between PV array area and battery  Saudi Arabia has rich solar resources so PV can be used  for power generation crisis. Methodology is proposed to maximize the contribution of  PV and minimize the electricity generation cost along  with availability of appropriate st










           Highlights  Bengal.                                for laboratory load.  COE is $0.281







               Indian village  Remote islands  North West of Iran  Le Havre, France  Accra in Ghana  Odisha in India  MMUT Gorakh-  pur, India  Indonesia  Ecuadorian coast


           Site       Israel  Dhahran


           Hybrid system combinations  W–B  W–B  PV–D–B  PV–D–B  Hydro–PV–W–fuel cell  PV–B–D and PV–W–D  PV–W–hydro  PV–W–B  PV–W–generator–B  PV–D  PV–D–B–W













                      Ofry and Braunstein [28]  Shaahid and Elhadidy   Kaldellis et al. [30]  Mostofi and Shayeghi   Srivastava and Giri [35]





           References  Saha [27]  [29]   [31]  Zhang et al. [32]  Acakpovi [33]  Pradhan et al. [34]  Mehang et al. [36]  Barzola et al. [37]