138   Improving Machinery Heliability
                          b. Vibration  including X-Y  plot of  amplitude versus rpm during startup  and
                            shutdown
                          c. Bearing-metal temperatures
                          d. Observed critical speeds
                       3 1. Rotor-balance logs
                       32. Rotor mechanical and electrical run-out
                       33. “As-built” API data sheets
                       34. “As-built” dimensions (including design tolerances) and/or data for:
                          a. Shaft or sleeve diameters at:
                            1. Thrust collar (for separate collars)
                            2. Each seal component
                            3. Each wheel (for “stacked” rotors)
                            4. Each interstage labyrinth
                            5. Each journal bearing
                          b. Each wheel bore (for “stacked” rotors) and OD
                          c. Each labyrinth or seal ring bore
                          d. Thrust-collar bore (for separable collars)
                          e. Each journal-bearing ID
                          f. Thrust-bearing concentricity (axial run-out)
                          g. Metallurgy and heat treatment for:
                            1. Shaft
                            2. Wheels
                            3. Thrust collar
                            4. Blades (buckets)
                       35. Operating and maintenance manuals
                            Manuals  shall be furnished  describing  installation,  operation,  and mainte-
                          nance procedures. Each manual shall include the following sections:

                            Section I-Installation:
                          a. Storage
                          b. Foundation
                          c. Grouting
                          d. Setting equipment, rigging procedures, and component weights
                          e. Alignment
                          f. Piping recommendations including allowable flange loads
                           g. Composite  outline  drawing  for driveddriver train,  including anchor-bolt
                            locations
                            Section 2-Operation:
                           a. Startup
                           b. Normal shutdown
                           c. Emergency shutdown
                           d. Operating limits
                           e. Lube oil recommendations
                            Section 3-Disassembly  and reassembly instructions:
                           a. Rotor in casing
                           b. Rotor unstacking and restacking procedures
                           c. Journal bearings