Page 73 - Improving Machinery Reliability
P. 73

Requirements Specification   45

              ~
                             REASSEMBLY  PROCEDURES

                           FOR  MAJOR  H.P.  STEAM  TURBINES
                       MACHINE  TAQ NO.  El-201 Propane Rdrigera~ion
                                                                   hrs















               (35) l'he  low pressure side ceaing bolts are tightened with a   3
                  homer or extension wrench until the specified torque values   IbZ)
                  are reached.  Exhaust casing connection bolting must be loose
                  before the horizontal joint bolts are tightened.  Only then
                  can the attaching bolts be tightened.















               (36)  Inspection before assembling the governor-aide bearing.   2
                   After cleaning the upper bearing housing, the bearing liner   1bS)
                   la  fitted, and plastigage placed on the bearing liner.
                 OAT€                                      FILE REFERENCE
               5/9/80       MACHINERY RELIABILITY PROGRAM   M-80.4-C2Ol

                 Figure 1-31. Reassembly procedures for major HP steam turbines.


           Illustrated  instructions  of  this type also serve as training  material  for personnel
         involved in turnaround execution. A copy of the manual belongs on the compressor
         deck for the duration of the machinery turnaround. Its conscientious use cannot help
         but reduce the risk of oversights and delayed restarts of major machinery. This illus-
         trated manual is also highly useful to planners whose detailed turnaround scheduling