3.1! SELECTION OF SYSTEM 3 5
FIGURE 3.12 Selection of system.
* Accept systems that fulfill the targets for further comparison.
• If no acceptable system exists, return to calculation of Total Loads to
consider whether there is something that can be done with the total
loads.